23 December 2003

0800 Departed Pier 62, North River

Getting ready to depart In the North River (Hudson River).
Putting a line out on the Harvey Putting a line out on the Harvey
The crew of the John J. Harvey musters for an early morning departure to escort the tug Pegasus to the shipyard in Tottenville, Staten Island. We put a line out on the Harvey to gain a few knots. We were awfully slow with a bent wheel and no water around the wheel--we’d removed a lot of ballast--more on that later.
1130 Make approach to the shipyard entrance.
Near the Goethals Bridge Near the entrance
The Goethals Bridge. Still alongside the Harvey. Near the entrance to the shipyard.
1200 Secured at Garpo Marine, Tottenville, Staten Island.
At Garpo Marine Getting ready to be hauled out
Secured at Garpo Marine. Pegasus ready for an early morning haul.
Crew Crew
Crew: Matt Umanov, Matteo from Triest, Pamela Hepburn, Julie Nadel, Dave Black, Justin Ryan, Don. Don, Jason Doherty, Frank Zic and Dave Black.
The Harvey standing by  
The Harvey standing by for the return trip.  
24 December 2003  
0700 make ready for the haul. Rain, nearly freezing.
Ready for the haul Rising
Ready to be hauled. Rising and rolling forward.
0800 Tug Pegasus is over the land.  
Over land Over land
Still in midair. Being rolled into the yard.
1130 Tug Pegasus is on land.  
Secure on land  
Tug Pegasus is secure on her blocks and poppets at Garpo Marine, Tottenville, Staten Island  

How much does the Pegasus weigh?

Displacement curve drawing

Drawing courtesy of the Baltimore Museum of Industry, MD

Go to the top of the page

© 2008 Tug Pegasus Preservation Project
Home | History | Restoration Logs | Programs | Tug Art | Ship's Store | Links | About Us | Site Map